THE COLLABORATION IN THE WINDSTAR CRUISES PROJECT-SHIP LENGTHENING- IN PALERMO, CONTINUES TO BE A GREAT CHALLENGE AND OPPORTUNITY!

THE  COLLABORATION IN THE WINDSTAR CRUISES PROJECT-SHIP LENGTHENING- IN PALERMO, CONTINUES TO BE A GREAT CHALLENGE AND OPPORTUNITY!

THE COLLABORATION IN THE WINDSTAR CRUISES PROJECT-SHIP LENGTHENING- IN PALERMO, CONTINUES TO BE A GREAT CHALLENGE AND OPPORTUNITY!

  • The Tefin team, about 70 specialized technicians, is working on the project.

  • The project, started in October 2019, is now scheduled to end in August 2021.

  • Tefin is providing the electrical work/refitting mostly for the public areas, along with the propulsion control station, the motor system and for the 

  • Two of the three ships of Windstar Cruises, Star Breeze and Star Legend have been We are now successfully finalizing work on Star Pride.

 We all know that, job-wise,  conversions, retrofits &  New Builds require innovation to be   adjusted to the needs  which arise and are ascertained during the work in progress.

– As a matter of fact, our  engineers developed/installed NEW SYNOPTIC PANELS for signaling watertight  and side  doors for  the Wheelhouse and the onboard Safety Center, carrying out:  – Dismantling of pre-existing  panel– Analysis of the existing system – Carpentry  and   cable laying — Electrical connections with the new installed doors — Wiring of the new panels — Interface electronics wiring — Functional tests

The panel was modified to allow the addition of 7 new watertight doors and 2 new side doors, as well as the screen printing of the “ stretchedship.
Synoptic panels allow  to facilitate and simplify activities in the workplace and on board the ship!
Looking for suitable solutions and comfort for our customers  is part of our job.

We enjoy doing so…and we have the SKILLS TO PERFORM ACCORDINGLY!